Featured Projects

My BrandSite's image

Fleet Street, London

500mm HDPE Slip Lining Project in Fleet Street, London
The length of the project was 800m and the duration was 8 weeks

My BrandSite's image

Chalk Farm, London

500mm HDPE Slip Lining Project in Chalk Farm, London
The length of the project was 1.5km and the duration was 12 weeks

My BrandSite's image

Jacksonville, USA

900 mm HDPE Tight Fit Lining Project, 6 km in length.
The project was carried out in Jacksonville, USA over a 20-week period

My BrandSite's image

M25 Junction 10 UK

M25, UK Junction 10 Widening Scheme Diversionary Works.
Installation of 630mm medium pressure gas main including all Butt fusion / Electro fusion.
The project included a 12m deep shaft and took 6 months to complete.